Nail the starter strip about 3 up from the leading edge using 4 nails evenly spaced for a full strip approximately 10 12 inches apart.
Roof shingle installation drip edge.
Gently lift up the shingles on the edge of the roof and locate the nails holding the existing drip edge onto.
How to fix a roof drip edge installing roof drip edge flashing properly.
L shape drip edge is a simple 90 degree bend with a flare out at the bottom of the short leg.
How to install a drip edge.
Always install flashing around a chimney and other valleys where two roof planes meet as these areas are more prone to leaks if not protected.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
T shape drip edge is an l shaped flashing in which the long leg folds back on itself before heading down 90 degrees to form the short leg.
It can be done.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Save yourself some.
Install the starter strip so that it overhangs the drip edge by 1 2 inch.
Make sure the outer edge extends over the gutter.
Install new flashing metal flashing is often called drip edge along the bottom of the roof near your gutters.
Once all the underlayment is applied go back and place.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
Secure the drip edge with roofing cement.
Use a flat pry bar and hammer to pry the nails out of the drip edge gently.
Nail the drip edge in place using your hammer and roofing nails.
Install roof drip edge along the eaves add underlayment then place drip.
If it doesn t pull the drip edge out slightly from under the shingles.
Place the metal roof drip edge flashing along the gable ends.