This should replace the strength of the original gusset plate.
Roof plate fixing.
Cut a piece of 1 2 inch plywood that will cover the area.
Remove roofing and turn each sheet over.
Slide the flat bar under starter course and pry out the nails.
Use a flat pry bar to remove drip edge nails along the eave and rakes.
9kn and 16kn truss to top plate fixing used in pairs the cpc40 cleats achieve 9kn and the cpc80 cleats achieve 16kn.
Even when nails or structural screws are used spacing m ust be considered and the fasteners used at the repaired joint or member extend much further from the joint or crack than a metal connector plate.
At 7 05 paul begins replacing the drip edge roof flashing.
If a roof has been re roofed with heavier roofing material than the original roof was engineered for.
If you can easily stick a screw driver into.
Damaged roof decking should be repaired by a professional but you can create a temporary solution by following these steps.
I e the original roof was a light wood shingle roof and the new replacement roof is a concrete tile roof weighing 5 or 10 times more than the original roof.
The required pack comes supplied with the appropriate cleats and screws to penetrate through the timber top plate packer and into the top plate.
You may need to use a putty knife to break the seam between the first course and the starter strip.
If fixing screws are left in the valleys your roof will leak in hundreds of places.
To fix the joists and rafters down on to the wall plates they should be toe or skew nailed to the top plate like below.
You will have to paint the roof but is cheaper than buying new roofing.
Measure the damaged area between your roof rafters or trusses.
What was previously a valley in the corrugations will now be a ridge and the nail hole will be in the correct place.